xpeditis2.0/docs/debug/elementmissingphase2.md
David d65cb721b5
Some checks are pending
CD Production (Hetzner k3s) / Promote Images (preprod → prod) (push) Waiting to run
CD Production (Hetzner k3s) / Deploy to k3s (xpeditis-prod) (push) Blocked by required conditions
CD Production (Hetzner k3s) / Smoke Tests (push) Blocked by required conditions
CD Production (Hetzner k3s) / Deployment Summary (push) Blocked by required conditions
CD Production (Hetzner k3s) / Notify Success (push) Blocked by required conditions
CD Production (Hetzner k3s) / Notify Failure (push) Blocked by required conditions
chore: sync full codebase from cicd branch
Aligns main with the complete application codebase (cicd branch).

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-04 12:56:44 +02:00

16 lines
708 B
Markdown

🎯 ÉLÉMENTS NON IMPLÉMENTÉS (Non critiques pour MVP)
Backend
❌ 2FA TOTP (marqué optionnel)
❌ Onboarding flow API (non critique)
Frontend
❌ Password strength meter (UX enhancement)
❌ Onboarding wizard (non critique)
❌ User profile page séparée (peut utiliser settings)
❌ 2FA setup UI (2FA non implémenté backend)
❌ Address autocomplete Google Maps (saisie manuelle suffit)
❌ Address book (feature future)
❌ HS Code autocomplete (feature future)
❌ Document upload dans booking form (peut upload après)
❌ Edit booking page (feature future)
❌ Cancel booking UI (feature future)
TOUS ces éléments sont des "nice-to-have" et ne bloquent PAS le lancement du MVP!