xpeditis2.0/docs/debug/elementmissingphase2.md
David d65cb721b5
Some checks are pending
CD Production (Hetzner k3s) / Promote Images (preprod → prod) (push) Waiting to run
CD Production (Hetzner k3s) / Deploy to k3s (xpeditis-prod) (push) Blocked by required conditions
CD Production (Hetzner k3s) / Smoke Tests (push) Blocked by required conditions
CD Production (Hetzner k3s) / Deployment Summary (push) Blocked by required conditions
CD Production (Hetzner k3s) / Notify Success (push) Blocked by required conditions
CD Production (Hetzner k3s) / Notify Failure (push) Blocked by required conditions
chore: sync full codebase from cicd branch
Aligns main with the complete application codebase (cicd branch).

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-04 12:56:44 +02:00

708 B

🎯 ÉLÉMENTS NON IMPLÉMENTÉS (Non critiques pour MVP) Backend 2FA TOTP (marqué optionnel) Onboarding flow API (non critique) Frontend Password strength meter (UX enhancement) Onboarding wizard (non critique) User profile page séparée (peut utiliser settings) 2FA setup UI (2FA non implémenté backend) Address autocomplete Google Maps (saisie manuelle suffit) Address book (feature future) HS Code autocomplete (feature future) Document upload dans booking form (peut upload après) Edit booking page (feature future) Cancel booking UI (feature future) TOUS ces éléments sont des "nice-to-have" et ne bloquent PAS le lancement du MVP!